Breakbulk operation

Moving the longest ever single piece on the cellular containerized vessel
3/23/2023

THE CHALLENGE

The hurdle to be overcome was to move the longest ever single piece on the cellular containerized vessel from China to Spain.

The 43 metre long  item required a range of multimodal services from pick-up at a factory in Zhenjiang on the banks of the Yangtze River in China’s eastern Jiangsu Provinice, north west of Shanghai through to final delivery in Algeciras, southern Spain.

THE CEVA SOLUTION

Collaborating with our parent company CMA CGM and with privileged access to their vessels we were able to complete the project successfully

We organized pre-carriage from origin by flash barge and coordinated with ocean terminals in Shanghai and Algeciras to ensure this breakbulk operation went without a hitch. Road freight, the barge and ocean freight all formed part of the solution.

CEVA Logistics

TANGIBLE RESULTS

icon_volume
UNIT OF
43

metre long

icon_shipping_blue
Multimodal
OCEAN - ROAD

Solutions